ERP for manufacturing: planning, materials, traceability and real cost

What a manufacturing ERP does, from the customer order to the real cost per batch, which data it needs, how it compares with spreadsheets and MES, and how to choose the first step.

Key points

  • Planning is only as good as the bills of materials, times and capacities you enter.
  • Operators confirm only the data you later use for planning, costing or traceability.
  • Traceability starts when the warehouse receives raw materials, long before the first complaint.
  • You can start with a single line or one product family.

What a manufacturing ERP does

When the production manager receives an order, they need three answers: whether there are materials, whether there is capacity and when the order can ship. Without a shared system, the answers come from spreadsheets, calls to the warehouse and colleagues’ memory.

A manufacturing ERP ties these answers to the same order. The flow below shows the path of an order, from the request to the real cost.

The path of an order in a manufacturing ERP
  1. Order or forecastSales enter the demand, with the date promised to the customer.
  2. Material requirementsThe planner sees what is short after stock and released orders, and approves the proposed purchases.
  3. Production orderThe planner chooses the line, the day and the crew.
  4. Shop floor executionOperators confirm good quantity, scrap and time.
  5. Quality controlThe inspector links the result to the batch produced.
  6. Delivery and real costThe accountant sees what the order cost, compared with the estimate.

The calculation of material requirements is called MRP (Material Requirements Planning).

The data planning depends on

A wrong production plan usually comes from outdated data rather than from the software. If a bill of materials has a wrong quantity, the system proposes the wrong purchases on every order.

The table shows the master data, what goes wrong when it is incorrect and who keeps it up to date.

Master data in a manufacturing ERP
CriterionWhat it containsIf it is wrongWho maintains it
Bill of materialsComponents and quantities for one unitYou buy too much or stop for lack of materialThe product engineer
RoutingOperations, their order, the machine and the timePromised dates are missedThe process engineer
CapacityAvailable hours per machine and per shiftThe plan loads a line beyond what it can doThe production manager
Supplier lead timeHow many days each supplier needs to deliverMaterial arrives after the planned dayThe purchasing lead
Safety stockThe minimum quantity kept in stockToo much cash tied up, or stoppagesPurchasing, together with production
Bill of materials versionWhich version was used and from what dateYou cannot explain what you produced for a customerThe product engineer, with approval

Spreadsheets, standard ERP, custom ERP or MES

These terms often get mixed up. An MES (Manufacturing Execution System) tracks in detail what happens on the machines, while an ERP connects production with sales, purchasing, stock and accounting.

The comparison below helps you see what is missing in your company today. The differences between a standard product and a built one are covered in custom ERP development.

What each option covers in manufacturing
CriterionSpreadsheetsStandard ERP with a manufacturing moduleCustom ERPMES
PlanningManual, by one personBy the product’s rulesBy your company’s rulesDetailed, per machine and per hour
Actual consumption and scrapNoted at the end, if at allConfirmed on the production orderConfirmed on the order, on a tablet or scannerAlso read from the machines
Batch traceabilityHard to reconstructYes, if batches are used consistentlyYes, with your company’s rulesYes, for the shop floor stage
Link to sales and accountingThrough copyingYesYes, or through an integration with your existing softwareThrough an integration with the ERP
A good fit forFew products and ordersProcesses close to the product’s standardYour own recipes, variants or exceptionsAutomated lines with machine data

Signs your production needs an ERP

Each sign below costs you money: a missed delivery date, material bought twice or an order sold below cost.

  • The weekly plan lives in a file that only one person understands.
  • You find out a material is missing when the operator looks for it in the warehouse.
  • The salesperson promises a date without seeing how loaded the lines are.
  • You do not know what an order cost until the accountant works it out at month end.
  • When a complaint arrives, someone searches folders and consumption slips for the batches.
  • Someone types the same order into the quote, the production plan and the invoice.

Traceability, from batch to customer

Traceability means you can go back from the delivered product to the raw material batches and the operations it went through. Customers in automotive, food or medical sectors often require it by contract.

It works only if the warehouse records the batch at receipt and the operator confirms it at consumption. One empty field at receipt breaks the whole chain.

What you should find out within minutes of a complaint

0 of 6 checked

Planned cost and real cost

The planned cost starts from the bill of materials and the estimated times. The real cost uses what operators confirmed: consumption, times and scrap.

The gap between them shows where you lose money. You use it to correct bills of materials, times or the selling price for the next orders.

Cost components of a production order
CriterionPlanned costReal costWhere the gap comes from
MaterialsQuantity from the bill of materials, at standard priceQuantity consumed, at the batch priceScrap, substitutions, changed prices
LabourTime from the routingTime confirmed by operatorsSetups, waiting, new operators
MachinesEstimated hours per machineHours confirmed on the orderStoppages and product changeovers
ScrapEstimated percentageQuantity declared non-conformingQuality problems with material or process
OverheadRate set by accountingThe same rate, on actual hoursOrders that occupy the line longer than estimated

How to choose the first step

You do not have to change everything at once. Answer the questions below to see where it makes sense to start.

Where should your manufacturing ERP start?

Three questions about where you lose the most time.

Where do most problems appear?

How different are your products?

What software do you use now?

Answer every question to see the recommendation.

All possible results
  • Standard ERP with a manufacturing module. Your processes are close to standard. Compare products on bills of materials, batches and real cost, and give the module list less weight.
  • Custom ERP, built in stages. Your bills of materials, variants or rules do not fit easily into a standard product. Start with one line or one product family.
  • Shop floor confirmations on a tablet. The first gain comes from consumption and scrap confirmed at the machine. The software you already have then receives this data.
  • Integration between your existing software. You keep what works and connect production orders with invoicing, so nobody types an order twice.

How Webmate works on a manufacturing ERP

We start from a real order and follow it with your team, from quote to delivery. We note every place where someone copies data, looks for a material or calculates something by hand.

The first stage covers one line or one product family, and your team uses it before the rest of the project. Stages and their cost are explained in ERP pricing and implementation cost, and the risks in ERP implementation stages and risks.

Systems built by Webmate have no per-user cost, so shop floor operators get access without extra licences. One example of a system built in stages is Center Electric, a distribution company. There, the online store, warehouse system, ERP and CRM were added one after another, starting in 2018.

Relevant Webmate resources

Continue with guides, services and examples directly connected to the topic of this article.

ERP modules and features ERP implementation stages and risks ERP pricing and implementation cost ERP and WMS integration ERP vs accounting and inventory software Custom ERP for manufacturing Pricing and estimates

Frequently asked questions

What is MRP in an ERP?

MRP calculates which materials to buy, based on orders, stock, bills of materials and supplier lead times.

Does the ERP replace the system on the machines?

Not necessarily. The ERP can connect to an MES or to the machines, and each system keeps its role.

Can we start with a single line?

Yes. One line or one product family lets you correct bills of materials and times before you extend the system.

Do operators have to work on a computer?

No. They can confirm consumption and scrap on a tablet, a phone or a terminal next to the machine.

Can we keep our accounting software?

Yes. The ERP connects to your accounting software, which remains the source for tax filings.