Key points
- Planning is only as good as the bills of materials, times and capacities you enter.
- Operators confirm only the data you later use for planning, costing or traceability.
- Traceability starts when the warehouse receives raw materials, long before the first complaint.
- You can start with a single line or one product family.
What a manufacturing ERP does
When the production manager receives an order, they need three answers: whether there are materials, whether there is capacity and when the order can ship. Without a shared system, the answers come from spreadsheets, calls to the warehouse and colleagues’ memory.
A manufacturing ERP ties these answers to the same order. The flow below shows the path of an order, from the request to the real cost.
- Order or forecastSales enter the demand, with the date promised to the customer.
- Material requirementsThe planner sees what is short after stock and released orders, and approves the proposed purchases.
- Production orderThe planner chooses the line, the day and the crew.
- Shop floor executionOperators confirm good quantity, scrap and time.
- Quality controlThe inspector links the result to the batch produced.
- Delivery and real costThe accountant sees what the order cost, compared with the estimate.
The calculation of material requirements is called MRP (Material Requirements Planning).
The data planning depends on
A wrong production plan usually comes from outdated data rather than from the software. If a bill of materials has a wrong quantity, the system proposes the wrong purchases on every order.
The table shows the master data, what goes wrong when it is incorrect and who keeps it up to date.
| Criterion | What it contains | If it is wrong | Who maintains it |
|---|---|---|---|
| Bill of materials | Components and quantities for one unit | You buy too much or stop for lack of material | The product engineer |
| Routing | Operations, their order, the machine and the time | Promised dates are missed | The process engineer |
| Capacity | Available hours per machine and per shift | The plan loads a line beyond what it can do | The production manager |
| Supplier lead time | How many days each supplier needs to deliver | Material arrives after the planned day | The purchasing lead |
| Safety stock | The minimum quantity kept in stock | Too much cash tied up, or stoppages | Purchasing, together with production |
| Bill of materials version | Which version was used and from what date | You cannot explain what you produced for a customer | The product engineer, with approval |
Spreadsheets, standard ERP, custom ERP or MES
These terms often get mixed up. An MES (Manufacturing Execution System) tracks in detail what happens on the machines, while an ERP connects production with sales, purchasing, stock and accounting.
The comparison below helps you see what is missing in your company today. The differences between a standard product and a built one are covered in custom ERP development.
| Criterion | Spreadsheets | Standard ERP with a manufacturing module | Custom ERP | MES |
|---|---|---|---|---|
| Planning | Manual, by one person | By the product’s rules | By your company’s rules | Detailed, per machine and per hour |
| Actual consumption and scrap | Noted at the end, if at all | Confirmed on the production order | Confirmed on the order, on a tablet or scanner | Also read from the machines |
| Batch traceability | Hard to reconstruct | Yes, if batches are used consistently | Yes, with your company’s rules | Yes, for the shop floor stage |
| Link to sales and accounting | Through copying | Yes | Yes, or through an integration with your existing software | Through an integration with the ERP |
| A good fit for | Few products and orders | Processes close to the product’s standard | Your own recipes, variants or exceptions | Automated lines with machine data |
Signs your production needs an ERP
Each sign below costs you money: a missed delivery date, material bought twice or an order sold below cost.
- The weekly plan lives in a file that only one person understands.
- You find out a material is missing when the operator looks for it in the warehouse.
- The salesperson promises a date without seeing how loaded the lines are.
- You do not know what an order cost until the accountant works it out at month end.
- When a complaint arrives, someone searches folders and consumption slips for the batches.
- Someone types the same order into the quote, the production plan and the invoice.
Traceability, from batch to customer
Traceability means you can go back from the delivered product to the raw material batches and the operations it went through. Customers in automotive, food or medical sectors often require it by contract.
It works only if the warehouse records the batch at receipt and the operator confirms it at consumption. One empty field at receipt breaks the whole chain.
What you should find out within minutes of a complaint
0 of 6 checkedPlanned cost and real cost
The planned cost starts from the bill of materials and the estimated times. The real cost uses what operators confirmed: consumption, times and scrap.
The gap between them shows where you lose money. You use it to correct bills of materials, times or the selling price for the next orders.
| Criterion | Planned cost | Real cost | Where the gap comes from |
|---|---|---|---|
| Materials | Quantity from the bill of materials, at standard price | Quantity consumed, at the batch price | Scrap, substitutions, changed prices |
| Labour | Time from the routing | Time confirmed by operators | Setups, waiting, new operators |
| Machines | Estimated hours per machine | Hours confirmed on the order | Stoppages and product changeovers |
| Scrap | Estimated percentage | Quantity declared non-conforming | Quality problems with material or process |
| Overhead | Rate set by accounting | The same rate, on actual hours | Orders that occupy the line longer than estimated |
How to choose the first step
You do not have to change everything at once. Answer the questions below to see where it makes sense to start.
Where should your manufacturing ERP start?
Three questions about where you lose the most time.
Where do most problems appear?
How different are your products?
What software do you use now?
Answer every question to see the recommendation.
All possible results
- Standard ERP with a manufacturing module. Your processes are close to standard. Compare products on bills of materials, batches and real cost, and give the module list less weight.
- Custom ERP, built in stages. Your bills of materials, variants or rules do not fit easily into a standard product. Start with one line or one product family.
- Shop floor confirmations on a tablet. The first gain comes from consumption and scrap confirmed at the machine. The software you already have then receives this data.
- Integration between your existing software. You keep what works and connect production orders with invoicing, so nobody types an order twice.
How Webmate works on a manufacturing ERP
We start from a real order and follow it with your team, from quote to delivery. We note every place where someone copies data, looks for a material or calculates something by hand.
The first stage covers one line or one product family, and your team uses it before the rest of the project. Stages and their cost are explained in ERP pricing and implementation cost, and the risks in ERP implementation stages and risks.
Systems built by Webmate have no per-user cost, so shop floor operators get access without extra licences. One example of a system built in stages is Center Electric, a distribution company. There, the online store, warehouse system, ERP and CRM were added one after another, starting in 2018.
Relevant Webmate resources
Continue with guides, services and examples directly connected to the topic of this article.
Frequently asked questions
What is MRP in an ERP?
MRP calculates which materials to buy, based on orders, stock, bills of materials and supplier lead times.
Does the ERP replace the system on the machines?
Not necessarily. The ERP can connect to an MES or to the machines, and each system keeps its role.
Can we start with a single line?
Yes. One line or one product family lets you correct bills of materials and times before you extend the system.
Do operators have to work on a computer?
No. They can confirm consumption and scrap on a tablet, a phone or a terminal next to the machine.
Can we keep our accounting software?
Yes. The ERP connects to your accounting software, which remains the source for tax filings.